Remote Infrastructure Group
Free guide · for the contractor who runs the crew
65%

of the score was never about the price.

How a council evaluation panel actually scores a regional contractor, and what to send so your knowledge of the pits, the crew and the shire lands on the page the way they score it. Every example off a real package we prepared or managed this year. Nobody named.

  • The guidenine sections, every example off a real package
  • Six toolsrun them on the package in front of you
  • Four one-pagersfor the ute
  • The register, if you want itfirst call for quotes, work and event invitations
Open the guideWhat is inside

Five fields, about forty seconds. Free, and it stays free.

Open the guideOpens the moment you submit

Remote Infrastructure Group Pty Ltd (heath@remoteinfra.com.au) collects these details to send you the guide and, if you tick a box above and confirm it from the email we send, the emails or texts you asked for. If you tick to hear from us, we also send Meta a coded (hashed) copy of your email and mobile so it can match the sign-up to our advertising. Without your name, email, business, region and type of work the guide does not open. Some of our service providers hold data overseas, mainly in the United States. Our privacy policy says what we hold, who sees it, how to complain and how to see, correct or delete it.

0 of 5 to open it0%
Once you are in

The guide is the door. This is the room.

Tick the box on the form and you are on the RIG register, which is where we go first for every package we price and every job we run. Nothing to buy, nothing to renew.

  1. 1

    The guide and six tools, now

    Where the points are, what thin looks like, the float sum, bid or leave it, the gate cost, the count back and the lodgement checklist. Four one-pagers for the ute.

  2. 2

    The Monday note

    Coming soon: every council package closing in regional Queensland and New South Wales that fortnight, what each one needs to win, and which ones to leave alone for a regional crew.

  3. 3

    First call for quotes

    We price packages for regional contractors every week and we need local crews, plant, supply and consultants to price against. The register is where we look first, by region and what you do.

  4. 4

    Work, and the room

    Roles on crews before the ad goes up, work packages on the board, and invitations to the RIG events we run for the people on the register.

The guide and the tools are free whether or not you tick the box. The register is there if you want first call.

What is inside

Nine sections. Every one off a real package.

Restoration and roads packages prepared or managed by Remote Infrastructure Group across regional Queensland and New South Wales in 2026. No council, contractor or Superintendent is identified. The figures are floors off our own register and site records.

01

Where the points are

Three councils' published weightings, side by side. Price is a third of the score and most of the field spends ninety per cent of its effort on it.

02

The six things every bid is scored on

Capability, methodology, program, price, compliance, evidence. What each one is, and what thin looks like to the panel.

03

Read these five before you price

The annexure, the special conditions, the wet weather clause, the notice periods, the pit plan. The number nobody read on page two.

04

Month one decides the job

Seventeen documents, twenty business days, one gate between the letter of acceptance and the first grader moving.

05

What the record does

Claims that can be checked from site get certified. Claims that cannot become a negotiation.

06

Before you lodge

The ten places a tender loses points in the schedule nobody reads twice, as a tick sheet.

Tools, not theory

Six things you can run on the package in front of you.

Each one takes a minute. None of them need a spreadsheet, a consultant or a login. They tell you where you stand on this package, before you spend a fortnight on it.

The float sum

Your margin, the liquidated damages rate, and how many days of float the program needs before you price a line.

Bid or leave it

Eight questions against the six axes. A score per axis and a plain verdict for this package.

What the gate costs

Crew, plant and days waiting on the possession documents, as dollars.

Worth the fortnight

The package value and your margin against what the pack costs to write. What is actually on the table.

Count back from the close

A closing date in, the seven dates out, so the schedules that carry the score get the time.

The lodgement checklist

Ten items, a meter that fills as you go, and the one-pager for the wall.

Who it is for

The crew that keeps coming second on paper.

Regional civil contractors, builders and trades who know the roads, own the gear and have the people, and who keep losing council packages to a bigger name with a thicker submission. Also useful if you are an estimator or office manager doing the pack after hours.

What it is not

A sales pitch, or a template.

There is nothing to buy on the other side of the form. The guide tells you how the scoring works and what it costs to get it wrong. How we build a winning pack for a client stays with the client. If you want a second set of eyes on a package before it goes in, the first call costs nothing and we never tender against you.

What tender support looks like →